Portable Welding Enclosure System
We are specialized in providing welding enclosure that frequently used in the area where the hot work process is carried out especially in Oil & Gas Industry located all around Malaysia. Portable Welding Enclosure System (PWES) are varies by design and being made from flexible, interchangeable and flame retardant panels that allow for constructing habitats of any sizes and configurations to be installed in practically any location, including those of a particularly small spaces such as around wellheads and plant, or in confined spaces.
Our pressurized welding enclosure system has been used successfully by the Upstream and Downstream Oil & Gas Industry for years. Safe deployment of the enclosure has allowed naked flame and other hot work to be carried out without the need for a Production Shutdown. The system is ATEX Certified for use in Zone 1 & 2 Areas as it is a requirement in the Oil & Gas Industry in order to manage the risks when carrying out hot work in hazardous areas.
The welding enclosure is engineered and designed to reduce the risk of hot work in hazardous areas and can be used as an excellent engineering control for risk reduction when carrying out risk assessment. Our system is approved and certified by a third party which is SIRIM QAS International to be used in Oil & Gas industry. All equipment is intrinsically safe or ‘Ex’ rated for use in zones 1 or 2 making the habitat safe for use in potentially explosive atmospheres. If any hazardous gases detected, the gas detection equipment allows for automatic shutdown of inlet air to ensure the safety of the hot work process.
![]() | ![]() | ![]() |
Equipment for Portable Welding Enclosure System (PANEL) | ||
![]() 1 M x 1 M | ![]() 1 M x 1 M | ![]() 1 M x 1 M |
![]() 1 M x 2 M | ![]() 1 M x 1 M |
Portable Welding Enclosure System Facility at Labuan
Portable Welding Enclosure System (PWES) at Offshore | ||
![]() | ![]() | ![]() |
![]() | ![]() | ![]() |
![]() | ![]() |
No. | Client's Name | Project Description | Location | Period |
1 | Dayang (DESB) | E&I Project | Baronia Platform | Jan 2011 - Feb 2011 |
2 | Dayang (DESB) | E&I Project | Tukau Platform | Mac 2011 |
3 | Dayang (DESB) | Piping & E&I Project | West Lutong Platform | Jun 2011 |
4 | Dayang (DESB) | E&I Project | Bokor Platform | August 2011 |
5 | Shapadu | E&I Project | Bekok A Platform | April 2012 |
6 | Sarku | Structure, Handrill, E&I Project | F6 Platform | Nov 2011 - Dec 2011 |
7 | Sarku | Exhaust, E&I, Handrill and Structure Project | F23 Platform | Jan 2012 - Mac 2012 |
8 | Sarku | Service Platform, E&I, Riser, Exhaust and Structure | South Furious Platform | Mac 2012 - April 2012 |
9 | Shapadu | Provision of Safehouse Welding Habitat for Petrofac Chendor Phase 2 Development Project | Chendor | Nov 2012 - Dec 2012 |
10 | Carimin (CESSB) | Provision of Positive Pressure Welding Enclosure (PPWE) for Samarang Pipeline Replacement Project | Samarang | June 2013 - June 2014 |
11 | Carimin (CESSB) | Provision of Interface and Integration for MOPU and WSS for West Desaru Early Production (EPS) Project, Block PM304 | Block PM304, West Desaru | Sept 2013 |
12 | Petrofac / Shapadu | Provision of Safe House Welding Habitat for Berantai Project | Berantai | Feb 2014 |
13 | PCSB / Petra | Provision of Safety Habitat for Tukau TSP Project | Tukau Platform | Mar 2014 |
14 | PCSB / Pioneer Pegasus | Provision of Safe House Welding Habitat for West Lutong Project | West Lutong | April 2014 |
15 | Petrofac / PBJV | Provision of Safe House Welding Habitat Cendor Phase 2 Project | Cendor Platform | April 2014 On Going |
16 | PCSB / Carimin | Provision of Positive Pressure Welding Enclosure (PPWE) of Angsi ANDP-C & ANDP-D Early Monetization Project (Aemp 2.0 & 2.1) | Angsi Platform | April 2014 |
17 | PCSB / Petra | Provision of Safety Habitat for SKO Cluster 5 Phase 2 Project | Temana Platform | June 2014 - Oct 2014 |
18 | PCSB / Petra | Provision of Safety Habitat for Bokor Project | Bokor Platform | June 2014 - Sep 2014 |
19 | Trans Thai-Malaysia / Kencana Pinewell | Provision of Safe House Habitat for JDA Gas Balancing Evacuation (Eva) Project | MUDA Field | July 2014 - Nov 2014 |
20 | PCSB / Petra | Provision of Safety Habitat Services for Baram Infill Project | Baram Platform | July 2014 - Sep 2014 |
21 | PCSB / Dayang | Provision of Positive Pressure Welding Enclosure (PPWE) / Safe Habitat Services for Bekok-A Pump Replacement Project | Bekok-A Platform | Aug 2014 - Sep 2014 |
22 | KPOC / Kencana Pinewell | Provision for Supply Technician, Weld Habitat Units and Consumables for Kebabangan Northern Hub Development Project | Kebabangan Platform | Oct 2014 On Going |
23 | EMEPMI / Shapadu | Provision of Safe House Welding Habitat Services for Tapis EOR Project | Tapis Platform | Oct 2014 On Going |
24 | PCSB / Combine Ropny | Provision of Safe House Welding Habitat for West Lutong Project | West Lutong Platform | Nov 2014 On Going |
25 | PCSB / Pioneer Pegasus | Provision of Safety Habitat Services for Samarang Riser Guard Project | Samarang Platform | Nov 2014 On Going |
26 | PCSB / Pioneer Pegasus | Provision of Safety Habitat Services for Samarang Polymer Coupon Project | Samarang Platform | Nov 2014 |